| |||
|
A bid bond is needed for a contractor that is going after a job. The total amount of the job is 630,000 but the bid bond necessary is only $31,500 or 5% of the total bid. The job is a water line extension and the length of the job once awarded is 90 days. The work is being done in PA is this something you could help with? What shall I do in order to get the ball rolling?
|
| |||
| Quote:
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
| |